Tempo Shuttle – scaffold with lifting system for photovoltaic panels
Video presentations
Tempo Shuttle – scaffold with lifting system for photovoltaic panels · YouTube
For professional use
ISO 9000 14732 9606 2
This product has certified welds. All SVELT mobile scaffolds and many ladder models are made using automated welding systems that comply with the European standard for mechanised welding EN ISO 14732:2013. Some scaffold and ladder components are manually welded in accordance with the European welding standard EN ISO 9606-2. An external laboratory certifies the equipment and welders every year and issues a certificate confirming that the tests required by the regulations have been passed.
European standard UNIEN 1004
Indicates that the product is certified to the European standard (UNI EN 1004-1:2020) for mobile access and working towers, requiring high quality in dimensions and structural strength.
1-year warranty
Indicates that the product has a one-year warranty against manufacturing defects.
Load capacity 200 kg/m2
Indicates that the product has a maximum load capacity of 200 kg per square metre of walking surface. Walking platforms and internal ladders are considered part of the structure and do not affect its load capacity.
For 2 people
Indicates that the product is designed for simultaneous use by 2 people.
Politecnico di Milano
Indicates that Politecnico di Milano (the university of applied sciences in Milan) has tested the product and certified its compliance with UNI EN131-1-2-3-4 (ladders), UNIEN14183 (professional steps) and UNIEN1004 (scaffolds).
Once you get to the roof with the assembly, you proceed to install the lifting winch on top of the column which will be operated by a battery-powered drill (by the customer).
Suitable for lifting:
- Photovoltaic panels
- Insulating panels
- Roofing panels
Main elements:
- Track: Various sections to reach the desired height
- Winch: with lifting strap and carabiner. It is operated by a cordless drill
- Slide: can hold 2 photovoltaic panels. Equipped with gate and fastening strap
- Fixing clamps: connected to the rails allow them to be fixed to the rungs of the scaffolding
- Rubber side protection: avoids scratching the panels that are always resting on a soft and scratch-resistant surface
- Lower rubber supports: avoid scratching the edges of the panels which are always resting on a soft and scratch-resistant surface
- End section (shoulder) with space for convenient insertion of panels. The trolley rotates 90° to allow the panel to be inserted inside the scaffolding
- Elevation speed: 5 seconds per meter.
- Assembly time: 1 operator 10 minutes
SKU: SHUTTLE
Interested in this product? Send an inquiry for a quotation, availability or help choosing.